Customization: | Available |
---|---|
Type: | Induction Forging Machine |
Certification: | CE, ISO, RoHS, SGS, BV Ect. |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model
|
JLZ-110KW
|
||
Input power desire
|
3 phase 380V 50/60HZ
|
||
Max oscillate power
|
110KW
|
||
Max input current
|
175A
|
||
Output voltage
|
70-550V
|
||
Output current
|
30-200A
|
||
Oscillate frequency
|
1-20KHZ
|
||
Cooling water desire
|
≥0.5MPa ≥6L/Min
|
||
Duty cycle
|
100% 40°C
|
||
Dimensions(L*W*G)
|
Induction heater:630x600x1350mm
|
Forging furnace: 1250x600x580mm
|
|
Net weight
|
160kg/170kg
|
||
Cable length
|
2-6(Meters)
|
models
|
Max. Input Power
|
Heating ability of normal material
|
||
Steel or S.S to 1100 degree
|
Copper or brass to 700 degree
|
Aluminium to 500 degree
|
||
JLZ-35 forging furnace
|
35KW
|
1.25 KG/min
|
1.75 KG/min
|
1.46 KG/min
|
JLZ-45 forging furnace
|
45KW
|
1.67 KG/min
|
2.33 KG/min
|
1.87 KG/min
|
JLZ-70 forging furnace
|
70KW
|
2.5 KG/min
|
3.5 KG/min
|
2.92 KG/min
|
JLZ-90 forging furnace
|
90KW
|
3.33 KG/min
|
4.67 KG/min
|
3.75 KG/min
|
JLZ-110 forging furnace
|
110KW
|
4.17 KG/min
|
5.83 KG/min
|
4.58 KG/min
|
JLZ-160 forging furnace
|
160KW
|
5.83 KG/min
|
-------
|
6.67 KG/min
|
JLZ-200 forging furnace
|
200KW
|
9.0 KG/min
|
-------
|
8.50 KG/min
|
Packaging
|
|
Size
|
740 (L) * 680 (W) * 1760 (D)
|
Weight
|
194KG
|
Packaging Details
|
The normal package is plywood case(Size: L*W*H).
|
Transport/ Area
|
Central Asia
|
South East Asia
|
Europe
|
South America
|
America
|
Oceania
|
Express
|
2-3days
|
2-3days
|
1-2days
|
2-3days
|
1-2days
|
2-3days
|
Air
|
3-5days
|
3-5days
|
3-5days
|
3-5days
|
5-7days
|
3-5days
|
Sea
|
15-20days
|
15-20days
|
30-35days
|
30-35days
|
30-35days
|
15-20days
|